07 March 2009

The Making of an Auditorium

It was a carpark until about 2006.
Sometime in 2006, during the interim period, the car park was reformed into a green open space. It was a beautiful green site, with birds, squirrel and other small animals playing in the greenfield.
Then hoarding were seen creeping into the green site. Slowly, the foundation were laid and walls and roofs appeared.




There were times when heavy duty cranes were employed to bring heavy building materials into the site. Cranes were also used to pour concrete onto the foundation floor.



The work delayed during the rainy seasons.


After the rain work resumed. And finally the satisfying result.


The Auditorium now stand proud and elegant.